Phase 1 – Foundation (Pre-Pour) Inspection
Performed before concrete is poured to verify proper foundation setup, rebar placement, plumbing lines, and site preparation.
Phase 2 – Pre-Drywall Inspection
Completed before drywall installation to inspect framing, electrical wiring, plumbing, HVAC systems, and insulation.
Phase 3 – Final Inspection
Conducted once construction is complete to review workmanship, safety items, doors and windows, electrical outlets, plumbing fixtures, HVAC operation, and overall condition.